Transformer Tester

Professional Transformer Tester Manufacturer

 

Wuhan HUAYI Electric Power Technology Co., Ltd is a professional manufacturer in China, researching and manufacturing cable fault locator. HUAYI insists on developing and marketing independently, and make efforts to improve the products' quality, reduce cost, and improve efficiency. Widely used in electricity, water conservancy, petroleum, railway, mining, chemical industry and other industries.

 
First 12 Last 1/2
 
Why Choose Us

Rich Experience

The company was established in 2005 and has more than ten years of professional experience. It is one of the earliest manufacturers of high-voltage testers in China. Our products are involved AC/DC Hipot tester, series resonant test system, transformer tester, relay tester, circuit breaker/switch tester, oil/SF6 tester, cable tester and other electric instruments.

Professional Technology Support

Specialize in testing and solutions for more than 18 years. Own experienced engineers. Professional on delivery, installation, debugging, and training.

 

 

 

ISO Certification

We have a professional R&D technical team and strict quality control to ensure safety, accuracy and efficiency. Passed ISO9001 certification and obtained relevant patent certificates.

24 hours After-sales

Professional after-sales service, paying attention to customers' feedback about products; Providing solutions within 24 hours, if the customers have any problem; Act quickly and efficiently.

 

Types of Transformer Tester

Transformer Tan Delta Tester

Tan delta tester is an integrated structure with a built-in dielectric loss test bridge, variable frequency voltage regulation power supply, boost transformer, and SF6 high stability standard capacitor.

Transformer Turns Ratio Testing Meter

The multifunctional ratio tester is designed for three-phase transformers of power system, especially Z-winding transformer, rectifier transformer and Scott, reverse Scott and balance transformer of railway electrical system.

Generator Rotor AC Impedance Tester
VLF 90KV Hipot Tester

Transformer On-Load Tap Changer Tester

It is mainly used to measure the transition waveform, transition time, instantaneous transition resistance, and three-phase synchronization of transformer on-load tap-changer.

3 Phase TTR Tester

The 3 Phase TTR Tester is an innovative product with a compact size, more portable, and easy to carry.

 

Product Parameter

 

Ratio measuring range

0.8~10000

Measuring speed

Finish three-phase test within 1 min

Measurement accuracy

Measurement accuracy for high voltage 0.05%

Measurement accuracy for low voltage 0.1%

Measurement accuracy for phase angle:0.1°

Accuracy for ratio 0.1%(0.8-3000)/0.2%(3000-10000)

Customized full range of 0.1 level of equipment

Weight

3Kg

Ratio measuring range

0.8~10000

Measuring speed

Finish three-phase test within 1 min

Measurement accuracy

Measurement accuracy for high voltage 0.05%

Measurement accuracy for low voltage 0.1%

Measurement accuracy for phase angle:0.1°

Accuracy for ratio 0.1%(0.8-3000)/0.2%(3000-10000)

Customized full range of 0.1 level of equipment

Weight

3Kg

 

Operation Video

 

 

 
Benefits of Transformer Tester
 
01/

Improving the safety and reliability of transformers: Transformer testers can accurately measure various performance indicators of transformers, providing reliable guarantees for the safe and stable operation of transformers.

02/

Improving the service life of transformers: Transformer testers can monitor the operating status and performance of transformers, detect and solve problems in a timely manner, and thus extend the service life of transformers.

03/

Improving the maintenance efficiency of transformers: Transformer testers can quickly and accurately measure various parameters of transformers, providing reliable data support for transformer maintenance and repair, thereby improving maintenance efficiency.

04/

Reduce the failure rate of transformers: Transformer testers can promptly detect and solve transformer problems, thereby reducing the failure rate of transformers and minimizing losses caused by faults.

 

Common Tests Performed on a Transformer Tester
 

Load Testing: This is when the transformer is subjected to its expected operating conditions to see how it handles the load. It helps determine if the transformer can handle the demands placed on it without overheating or malfunctioning.

 

No-Load Testing: This test is all about making sure the transformer works efficiently when it’s not connected to any load. The goal is to check the core and winding conditions, and ensure no energy is wasted when it’s not in use.

 

High-Voltage Testing: A transformer has to deal with high voltages, so testing it under high-voltage conditions helps ensure it can withstand those stressors without short-circuiting or failing.

 

Insulation Testing: This one is all about making sure the transformer’s insulation is in good shape. Insulation failure can cause serious issues, so testing this aspect is a big deal.

 

Short-Circuit Testing: Here, the transformer is tested under conditions where a short circuit might occur. It’s crucial to see how the transformer reacts to these extreme situations to ensure it can protect itself.

 

Efficiency Testing: Finally, testing the efficiency of the transformer is important. A transformer needs to convert electrical energy with as little loss as possible, and this test helps measure how efficiently the transformer does that.

 

Application of Transformer Tester

 

Power Plants

A tester ensures that transformers used to step up or step down voltage in power generation are working safely.

01

Industrial Facilities

Transformers are used to power heavy machinery, so testing them ensures that everything’s running smoothly.

02

Electric Utilities

Power companies use testers to make sure the transformers in the field are reliable and can handle the load.

03

Manufacturing Plants

Some plants manufacture transformers, so having a tester is a must to ensure their products meet quality standards.

04

Repair and Maintenance Centers

When transformers need servicing, testers are used to diagnose any issues and test the repairs.

05

 

Accessory

 

 

Serial Number

Name

Amount

1

Mainframe

One

2

Test line

One

3

Power

One

4

Specification

One

5

Inspection Report

One

6

Certification

One

 

Usage Requirements

 

 

  • Please read the manual carefully before using the instrument.

 

  • During the test, ensure good contact and do not move the test clamp.

 

  • After the test is over, turn off the power supply and remove the test lead after the discharge is completed.

 

  • If any abnormality occurs during the instrument test, please shut down and restart.

 

  • If the instrument is not used for a long time, please charge it regularly to ensure the service life of the battery.

 

Our On-Site Services

 

productcate-1-1

 

How To Cooperate With Us

 

Please contact us with any questions about products, services, or technology issues. We will always be with you and listen to your needs.

Our address

Gaoxin 4th Road, No.40, Wuhan city, China

Phone Number

(+86)-18062012971/whatsapp:+8618064115448

E-mail

Sales@sinohipot.com/ tina@sinohipot.com

 

Packaging and Delivery

 

Packing detail:

Packing with wooden cases, provide different solutions of shipping way.

Payment:

We accept many payment term, such as T/T, Western Union, L/C.

Warranty period:

One-year warranty, Installation, and commissioning of specific products.

Delivery time:

Most of our products are in stock and can be delivered upon payment. The delivery time usually does not exceed 15 days.

 

productcate-1-1

productcate-1-1

 

Our Certificates

 

 

productcate-1-1

 

FAQ

Q: How can I place an order?

A: You can contact us online or sending us an inquiry. Please provide the details of your requirements as clear as possible. So we can send you the offer at the first time.

Q: When can I get the price?

A: Usually we quote within 24 hours after we get your inquiry.

Q: What is your minimum order quantity, can you send me samples?

A: Our minimum order quantity is 1 set, and the sample shipping fee needs to be provided by you.

Q: Do you have the products in stock

A: Most Of our tester has stock.You can contact us to make sure

Q: Is there the products tested before shipping?

A: Our products undergo factory testing and are accompanied by reports.

Q: Would you have a discount?

A: Yes we could offer different discount according to your order quantity. We also hold regular promotional activities every year.

Q: Have your products been exported?

A: We have more than 10 years of export experience. Please contact us to confirm if there is a local partner.

Q: What about the transportation?

A: Usually we take door to door express delivery ,cause it's more convenient and fast.

Q: Why is transformer testing important?

A: Faulty transformers can pose significant safety hazards such as fires, electrical shocks, and power outages. Testing helps identify potential faults and reduces the likelihood of accidents, making it a critical safety measure.

Q: How often should transformers be tested?

A: Routine testing is recommended annually or semi-annually, depending on usage and criticality.

As one of the most professional transformer tester manufacturers and suppliers in China, we're featured by quality products and competitive price. Please rest assured to buy cheap transformer tester made in China here from our factory.