Products
Automatic Transformer Test Bench
video
Automatic Transformer Test Bench

Automatic Transformer Test Bench

1.System operation is simple, safe and reliable.
2.system efficiency..
3. System humanized operation. 4.Reliable system operation.5.System measurement accuracy is high
Product Introduction

 

1. This technical proposal specifies the design, manufacturing, inspection, testing, technical data, acceptance, delivery and transportation, on-site debugging, after-sales service and other tasks of the transformer comprehensive test bench.

2. The products provided by the supplier have stable performance and reliable testing data, which are widely used in transformer and power reactor production and testing enterprises and are well received by users.

The following tests are following the standard IEC60076-1 ~5《power transformer》 and IEC60726《dry-type electric transformer》. The test items are shown in the following table:

No.

Test items

predelivery test

field test

1

Transformer no-load loss and no-load current percentage test

2

Transformer load loss and short-circuit impedance test

3

Power frequency voltage withstand test for transformer

4

Frequency doubling voltage withstand test for transformer

5

Transformer DC resistance tester

6

Transformer turn ratio group error test

7

Transformer insulation resistance and polarization index test

 

Product Parameter

 

No

Equipment name

Model

Qty

 

Remark

Part 1:main console

1-1

Automatic transformer comprehensive test console

HYBYQ-35k

1

unit

 

1-2

Low voltage auxiliary control cabinet

HYBYQ-35k

1

unit

 

1-2

Capacitance compensation device

300kvar

unit

electric control

1-3

Fully automatic test software system

HY-10C

1

set

 

industrial computer

all-in-one machine

 

Part 2:Transformer characteristic test

2

Transformer power analyzer

HYGL-805

1

unit

 

Induction electric voltage regulator

TSJA-160kVA

1

unit

10- 650V

Part 3:Transformer frequency doubling induction withstand voltage test

3

intermediate frequency generating set

HYJZ-100kVA

1

set

150Hz

4

Test transformer

HYYDJ-50kVA

1

set

100kV

Part 4: Transformer turn ratio group, insulation test part

5

Transformer turn ratio group tester

BBC-HI

1

set

 

6

DC resistance tester

ZZC-10A

1

set

 

7

Insulation resistance tester

 

1

set

 

38.5kV test lab device list

1-1

High voltage test auxiliary control cabinet

HYBYQ-35k

1

unit

Computer automatic control

2

Capacitance compensation control cabinet

HYBYQ-1350kvar

1

unit

2

Intermediate booster transformer

250kVA.

Input 600V,output 3.5kV/1.5kV 50HZ

1

unit

Manual tap-shift

3

High voltage standard current transformer

HYHL-400A

1

unit

Accuracy 0.05

High voltage standard voltage transformer

HYHJ-4kV

1

unit

Accuracy 0.05

 

Product Feature And Application

 

Design specification for a comprehensive test system in the transformer laboratory:

1. System operation is simple, safe, and reliable

The whole test system takes into account the safety of test personnel and the reliability of equipment operation

Various overvoltage and current protection functions are complete.

The space layout is reasonable and the wiring is clear and neat.

2. system efficiency

Make full use of microcomputer data processing technology, the measurement results are directly entered into the microcomputer for calculation. Save the trouble of manually substituting into the formula calculation. The external wiring is arranged in a unified manner, manual wiring is avoided as far as possible, and automatic switching is completed only with the control button on the test bench when the wire is changed.

3. System humanized operation

Make full use of the mechanical and electrical interlock functions, and skillfully combine them with the computer software program, effectively preventing the occurrence of misoperation, that is, if you do not operate in accordance with the safety procedure, the system will refuse to start, so as to effectively protect the safety of people and equipment

4. Reliable system operation

The system has two operation modes: manual and automatic. When the automatic operation mode is abnormal, the manual operation mode will be used, which will not affect the normal test task

5. System measurement accuracy is high

The measuring instruments and instruments of this system are higher than the national standard requirements.

 

Transformer characteristic test:

A.manual function

■ Use the buttons on the front panel to control the test program.

■ Record the test data manually and save it in the database.

■ The test process can be completed by PC software and loss meter data communication.

■ Test items can be selected by button, and only one test task can be run at a time.

■ All test functions and test procedures are selected and controlled by buttons on the front panel of the test bench.

automatic function

■ The test process can be controlled by the PC software on the PC, using the mouse and keyboard.

■ Test data can be automatically recorded and saved in the database.

■ The keys on the front panel can be invalid during automatic operation.

■ Test items can be selected through the button in the dialog box, and only one test task can be run at a time.

■ No load, load test, automatically record the ambient temperature.

■ In the temperature rise test, the automatic control function of constant power and constant current is supported, and the temperature test data is automatically recorded every 15 seconds (or an optional interval).

■ Test results such as insulation resistance and oil pressure resistance can be manually entered into the file to improve the test report.

■ Calibration of all test results according to the requirements of GB1094, IEC 60076 or ANSI C57 sequence latest standards.

■ After the test is completed, the database archive is automatically completed and the test report can be printed immediately.

■ Temperature rise test, can accurately calculate the test data automatically.

■ Can automatically perform waveform correction, rated voltage correction, frequency correction (50Hz, 60Hz) for no-load test data.

■ Automatic temperature correction (75 ° C, 100 ° C, 120 ° C, 145 ° C), rated current correction, frequency correction for load test data.

■ In no-load test, the high-voltage side voltage can be monitored, recorded and spectrum analysis.

■ During the load test, the low-voltage current can be monitored, recorded and analyzed.

 

 The performance meets the following requirements:

■The direct loop and indirect loop can be switched automatically.

■ The high-voltage current and voltage transformer adopt the principle of secondary switching.

■CT\PT automatic range switching

■transformer integrated test bench for the entire circuit for comprehensive control and measurement monitoring.

■The measured data are processed automatically by microcomputer and can be stored/printed as required.

■Adopt microcomputer automatic control measuring system test bench and manual operation electric control voltage regulation digital display two complementary systems.

■Zero protection, over current protection, over-voltage protection.

■ High voltage leakage current display and protection, 1:1 transformer safety grounding.

■The test transformer adopts the new oil-immersed test transformer with stronger insulation and greatly reduced volume capacity. Test station auxiliary facilities

■Safety alarm system.

■ System error alarm system.

■stainless steel isolation fence.

■Audible and visual danger warning system

 

FAQ

 

1. Delivery: Fast delivery and Flexible mode of transportation
2. Payment: Choose payment terms and payment way you convenient
3. Sale service: 24-hour online contact, Choose the right model of equipment according to your request, give the best offer, support customization
4. Warranty period: All machine quality guarantees for one year and lifetime technical support for you. Online response to customers' technical problems.

 

 

Customer visit

HUAYI

Our Service

01

Pre-sale service

Conduct product consultation, product promotion, marketing activities, and technical support for customer needs.

02

Delivery service 

Packing with wooden cases, provide different solutions of shipping way, accept different payment way. Save shipping cost and make sure the products arrived well. 

03

After-sales service

one-year warranty, Installation, and commissioning of specific products; Respond to consumer questions, answer consumer inquiries, and deal with consumer comments.

modular-1

Hot Tags: automatic transformer test bench, China automatic transformer test bench manufacturers, suppliers, factory, electric meter calibrator, insulator voltage detector, ac dc withstand voltage tester, Ohm meter, transformer test list, VLF 60kv test kit