Knowledge

Why PD monitoring is MANDATORY during AC Hipot?

Jul 06, 2026 Leave a message

Q: If we are doing a withstand test, why also monitor partial discharge?

A: Hipot is a "Pass/Fail" test; PD is a "Diagnostic" test. PD finds the root cause before the explosion.

Strategic Benefits:

❶ Safety Buffer: PD rising at 80% voltage allows you to STOP before the GIS is destroyed.

❷ Zoning: PD tells you exactly which gas compartment "tripped" during a flashover.

❸ Reliability: Finds defects that survive 1 min at test voltage but will fail in service.

 

PRPD Patterns - Identifying the "Tumor"

 

Q: How do I know if it is dust or a failing insulator from the dot cloud?

A: We use Phase Resolved PD (PRPD) patterns to fingerprint the defect.

Pattern Shape

Diagnosis

Threat Level

Random Spots

Moving Metallic Particles

❌ Critical (Jumping danger)

Symmetrical Clouds

Internal Voids (Bubbles)

⚠️ Warning (Electrical treeing)

Stable Brush

Fixed Protrusion (Burrs)

❌ Critical (Stress concentration)

Send Inquiry